Turnkey, GPU-Native AI Infrastructure.
The platform is built around control of power, not just access to it. Engineered for high-density hyperscaler, enterprise and sovereign workloads. Compliant with EU data residency and GDPR requirements.
Building for the AI factory of tomorrow. Cutting-edge, turnkey, GPU-native AI infrastructure in EMEA.
The platform is built around control of power, not just access to it. Engineered for high-density hyperscaler, enterprise and sovereign workloads. Compliant with EU data residency and GDPR requirements.
Land secured near Camp Bondsteel, with access to the transmission corridor. Master-planned for a 1.2 GW campus.
A dedicated, directly contracted power supply. Dardania AI controls the energy stack end to end.
Every data hall is built for direct-to-chip liquid cooling from the start, on the NVIDIA reference architecture. Nothing is adapted from an air-cooled design.
Multiple operators provide dedicated, redundant fiber backbone.
Power deliverability is now the binding constraint on AI infrastructure. Dardania AI is built for hyperscalers, sovereigns and enterprises that cannot wait years for capacity to come online.
A dedicated, directly contracted power supply protects the national grid and shields customers from rising tariffs and carbon taxes.
A scalable AI Factory engineered for hyperscaler, enterprise and sovereign demand, delivered in repeatable 50 MW increments to a 300 MW baseline, then on to 1.2 GW.
Energized megawatts without the multi-year wait for Western European capacity.
A GDPR- and EU data-residency-compliant framework, adjacent to the largest U.S. military base in the Balkans.
Liquid-cooled, NVIDIA reference-architecture capacity on direct-contracted power.
Developing a 1.2 GW AI Factory campus in Kosovo, Dardania AI will deliver 300 MW in Phase 1 by 2028, with 50 MW ready for service in 2027. Capitalizing on regional low-cost supply, our architecture ensures total platform control over the entire energy stack.





Each phase adds 300 MW, delivered in repeatable 50 MW increments. Timing beyond Phase 1 will be announced as work progresses.
Built around NVIDIA’s compute architecture, with Vertiv providing advanced power and cooling, and Black & White Engineering bringing it all together into one integrated campus.
DSX 2.0 AI-ready partner, in collaboration with NVIDIA and Vertiv.

Designed to the NVIDIA Vera Rubin DSX reference architecture. Compute density, power and liquid-cooling requirements drive the campus design instead of being retrofitted into it.

Prefabricated power, cooling and data hall blocks, added in 50 MW increments. Direct-to-chip liquid cooling with dry coolers for heat rejection.

A data-center-only engineering consultancy, 500+ engineers in 23 countries, leading design and integrating the power, cooling and construction workstreams.
Inaugural Stakeholder SummitInvestors, technology partners and government in Prishtina. Site tours in Ferizaj.Read →
Government support reaffirmedMeetings with the Minister of Industry, Entrepreneurship and Trade and the Minister of Digitalization, alongside partners from NVIDIA.
Ground brokenConstruction permit issued. Site works begin on the campus.Read →
Excavation and pad levellingSlab sized for the full 300 MW. Owner’s engineer engaged, design basis being finalized.Dardania AI brings together Silicon Valley expertise and institutional investment discipline to build and operate gigawatt-scale AI infrastructure across EMEA.
Backed by Dardania Capital, our team combines deep experience in technology, AI infrastructure, and operational value creation with over 20 years of experience operating in Kosovo.
A senior operating and investment bench across AI infrastructure, enterprise software, private equity, hyperscalers and platform execution.

Technology entrepreneur and investor with more than 20 years building and scaling AI-focused ventures, with deep expertise in operational value creation, M&A and structured capital.
LinkedIn →
Operator and investor with more than 30 years of experience, including as a senior executive and founder at public companies, with $3.5B+ in capital financings and $5.6B+ in completed M&A.
LinkedIn →
More than 30 years in enterprise SaaS, analytics and AI, including senior leadership roles at Oracle, Hyperion and Appen. Founded and exited OpsPanda and Heavy.AI.
LinkedIn →
Led one of Google’s fastest-growing global business units and earlier ran a $500M+ business unit at SAP, with senior roles at Adobe. Board operating director at QScale, focused on go-to-market and AI data center growth.
LinkedIn →
More than 20 years leading cloud, cybersecurity and data center infrastructure, and building mission-critical environments for enterprises and service providers.
LinkedIn →
Experienced technology and operating executive with a background spanning enterprise software, AI, IoT, and private equity. Previously held senior roles at Sumeru Equity Partners, C3 AI, Bain & Company, and GE.
LinkedIn →
Co-founder and Managing Director of Hercules Capital, with more than 30 years in venture debt and structured growth financing across technology and infrastructure. Previously CFO and VP of Finance at technology companies.
LinkedIn →
More than 30 years in energy, including as Chief Operating Officer of California Resources Corp., California’s largest oil producer, where he ran $2B capital budgets and 800 staff.
LinkedIn →
Corporate counsel for Dardania AI in Europe. Previously served on the National Economic Council of Albania and in legal roles at KEK, Kosovo’s state energy corporation, and led the Albanian Commercial Union.
LinkedIn →
Served in senior finance, operations, and M&A roles at technology companies. Completed multiple $100M+ M&A transactions. Previously William Blair, Sumeru Equity Partners and 3Gtms, through its sale to Descartes.
LinkedIn →
Technology, engineering and finance partners gathered to align on the Phase 1 build.
Read →
Site works begin on the 1.2 GW campus, with 300 MW in Phase 1.
Read →Planning AI capacity in EMEA for 2027 and beyond? Let’s connect in Berlin.
Read →
The strategic advantage of speed to market, NATO-grade security, and Western alignment.
Read →
How Dardania AI is building an independent energy model for AI infrastructure.
Read →Phase 1 delivers 300 MW with first energization in 2027. Turnkey, GPU-native, direct-contracted power.