Explore the Dardania AI Opportunity
- Phase 1 Capacity. 300 MW planned for offtake in 50 MW blocks, with first energization targeted for 2027.
- AI-Ready Infrastructure. Built around NVIDIA’s Vera Rubin DSX reference architecture, with Vertiv power and liquid-cooling solutions.
- Dedicated Power. Our direct-to-generation energy model, designed to deliver reliable power without competing with local consumers.
- Data Sovereignty. Infrastructure designed to support GDPR and EU data residency requirements in a secure, strategically located European market.
Let’s Meet in Berlin
Interested in exploring AI capacity with Dardania AI? We’d love to connect at NVIDIA GTC Berlin.
Email us with your preferred meeting time or complete our contact form. We’ll coordinate the details.
