Phase 1 · 300 MW · First energization 2027. Meet Dardania AI at NVIDIA GTC Berlin →
Kosovo · EMEA 42.5°N · 21.1°E

Powering Next-Gen AI Compute at Gigawatt Scale.

Building for the AI factory of tomorrow. Cutting-edge, turnkey, GPU-native AI infrastructure in EMEA.

Total capacity1.2GWFull campus build-out, engineered across four 300 MW phases
Power cost advantage40–50%Versus Western European hubs, on direct-contracted power
First energization2027Phase 1 · 300 MW, liquid-cooling ready and GPU-native
Infrastructure Platform

Turnkey, GPU-Native AI Infrastructure.

The platform is built around control of power, not just access to it. Engineered for high-density hyperscaler, enterprise and sovereign workloads. Compliant with EU data residency and GDPR requirements.

Land Secured and Permitted Land

Land secured near Camp Bondsteel, with access to the transmission corridor. Master-planned for a 1.2 GW campus.

  • <1 km to Camp Bondsteel
  • Four 300 MW phases
  • US- and NATO-aligned jurisdiction
Energy → Direct-Contracted Power

A dedicated, directly contracted power supply. Dardania AI controls the energy stack end to end.

  • Direct contracts with generators
  • 40–50% below Western European hubs
  • 3–7 year queues bypassed
Data Centers → 100% Liquid Cooled

Every data hall is built for direct-to-chip liquid cooling from the start, on the NVIDIA reference architecture. Nothing is adapted from an air-cooled design.

  • Liquid-cooled GPU superclusters
  • Vera Rubin ready
  • Repeatable 50 MW increments
Connectivity Carrier-Diverse Fiber

Multiple operators provide dedicated, redundant fiber backbone.

  • Low latency to Europe, Asia and the United States
  • Dark fiber available on the transmission grid
Why Now

A Relief Valve for a Power-Starved AI Economy.

Power deliverability is now the binding constraint on AI infrastructure. Dardania AI is built for hyperscalers, sovereigns and enterprises that cannot wait years for capacity to come online.

The constraint

Western European AI Infrastructure Growth Is Hitting Structural Bottlenecks

  • Prime hubs in the US and Western Europe are grid constrained: allocations are rationed and queue timelines uncertain.
  • Interconnection and substation upgrades carry multi-year lead times; transformers and switchgear are gating items.
  • Permitting and community approvals are tightening, especially around water use and grid impact.
  • Legacy facilities struggle with high-density, liquid-cooled AI loads; retrofits are slow and capital-intensive.
The unlock

Kosovo Offers a Faster, Lower-Cost Path to AI Infrastructure at Scale

  • Kosovo enables parallel execution across land, power, permits and design, reaching energized megawatts faster.
  • Materially lower construction and operating cost base, with among Europe’s lowest energy costs.
  • Greenfield campus designed for high-density GPU loads from day one, liquid-cooling ready.
  • US- and NATO-aligned governance with institutional structuring and a clear path to scale.
Energy

Secured Power Supply

A dedicated, directly contracted power supply protects the national grid and shields customers from rising tariffs and carbon taxes.

DirectcontractDirect-contracted energy. Dedicated industrial power contracts with generators, capitalizing on regional low-cost supply.
40–50%Power cost advantage versus Western European hubs.
€30–40M/yrOpEx savings per 50 MW deployment, insulating off-takers from tariff inflation and carbon taxes.
3–7yrGrid queues bypassed. A parallel-execution model replaces the interconnection wait in Western European hubs.
DedicatedsupplyEnergy independence. Dedicated transmission and industrial power contracts protect national energy security.
Offtakers

Purpose-Built for GPU-Native, High-Density Compute.

A scalable AI Factory engineered for hyperscaler, enterprise and sovereign demand, delivered in repeatable 50 MW increments to a 300 MW baseline, then on to 1.2 GW.

Hyperscalers

Energized megawatts without the multi-year wait for Western European capacity.

Sovereign

A GDPR- and EU data-residency-compliant framework, adjacent to the largest U.S. military base in the Balkans.

Enterprise

Liquid-cooled, NVIDIA reference-architecture capacity on direct-contracted power.

AI Factory

Central Europe's Only AI Factory.

Developing a 1.2 GW AI Factory campus in Kosovo, Dardania AI will deliver 300 MW in Phase 1 by 2028, with 50 MW ready for service in 2027. Capitalizing on regional low-cost supply, our architecture ensures total platform control over the entire energy stack.

Phased Build-Out

0 → 1.2 GW in Four Phases

MW · cumulative

Each phase adds 300 MW, delivered in repeatable 50 MW increments. Timing beyond Phase 1 will be announced as work progresses.

Design & Technology

Designed for AI from Day One

Built around NVIDIA’s compute architecture, with Vertiv providing advanced power and cooling, and Black & White Engineering bringing it all together into one integrated campus.

DSX 2.0 AI-ready partner, in collaboration with NVIDIA and Vertiv.

NVIDIA · Compute Architecture

Designed to the NVIDIA Vera Rubin DSX reference architecture. Compute density, power and liquid-cooling requirements drive the campus design instead of being retrofitted into it.

Vertiv · Critical Infrastructure

Prefabricated power, cooling and data hall blocks, added in 50 MW increments. Direct-to-chip liquid cooling with dry coolers for heat rejection.

Black & White · Owner’s Engineer

A data-center-only engineering consultancy, 500+ engineers in 23 countries, leading design and integrating the power, cooling and construction workstreams.

Tier III+2N redundancy on power, concurrent maintainability on the primary fluid network.
100% liquid cooledDirect-to-chip cooling. A sealed glycol-water loop charged once; heat leaves through outdoor dry coolers, not evaporation.
Minimalwater drawNo cooling towers. No continuous municipal water draw and no evaporative losses.
LowlatencyLow-latency reach. Carrier-diverse fiber to Europe, Asia and the United States.
50MW blocksModular first phase. Prefabrication cuts on-site labour and deployment time; each block can take offtake as it energizes.
AI Factory · Progress

Progress & Milestones.

  1. June 2026Inaugural Stakeholder SummitInvestors, technology partners and government in Prishtina. Site tours in Ferizaj.Read →
  2. July 2026Government support reaffirmedMeetings with the Minister of Industry, Entrepreneurship and Trade and the Minister of Digitalization, alongside partners from NVIDIA.
  3. August 2026Ground brokenConstruction permit issued. Site works begin on the campus.Read →
  4. September 2026Excavation and pad levellingSlab sized for the full 300 MW. Owner’s engineer engaged, design basis being finalized.
  5. October 2026NVIDIA GTC BerlinOctober 20–22 at STATION-Berlin. Let’s connect.Read →
  6. NextSlab pour, first 50 MW blockEPC award next.
  7. September 2027Buildings GPU-ready (target)Modular blocks added in sequence. Commissioning of the first block begins.
  8. December 2027First 50 MW ready for service (target)Phase 1 builds toward 300 MW through 2028. Capacity available for offtake now.Discuss capacity →
Company

Silicon Valley Execution. Institutional-Grade Governance.

Dardania AI brings together Silicon Valley expertise and institutional investment discipline to build and operate gigawatt-scale AI infrastructure across EMEA.

Backed by Dardania Capital, our team combines deep experience in technology, AI infrastructure, and operational value creation with over 20 years of experience operating in Kosovo.

Key Leadership

Operators Who Have Done This Before.

A senior operating and investment bench across AI infrastructure, enterprise software, private equity, hyperscalers and platform execution.

Albion Calaj
Chief Executive OfficerAlbion Calaj

Technology entrepreneur and investor with more than 20 years building and scaling AI-focused ventures, with deep expertise in operational value creation, M&A and structured capital.

LinkedIn →
Jim Chapman
PresidentJim Chapman

Operator and investor with more than 30 years of experience, including as a senior executive and founder at public companies, with $3.5B+ in capital financings and $5.6B+ in completed M&A.

LinkedIn →
Jon Kondo
Partnerships & GovernmentJon Kondo

More than 30 years in enterprise SaaS, analytics and AI, including senior leadership roles at Oracle, Hyperion and Appen. Founded and exited OpsPanda and Heavy.AI.

LinkedIn →
Todd Rowe
InfrastructureTodd Rowe

Led one of Google’s fastest-growing global business units and earlier ran a $500M+ business unit at SAP, with senior roles at Adobe. Board operating director at QScale, focused on go-to-market and AI data center growth.

LinkedIn →
Andrew Lamani
TechnologyAndrew Lamani

More than 20 years leading cloud, cybersecurity and data center infrastructure, and building mission-critical environments for enterprises and service providers.

LinkedIn →
Faton Gjuka
Platform ExecutionFaton Gjuka

Experienced technology and operating executive with a background spanning enterprise software, AI, IoT, and private equity. Previously held senior roles at Sumeru Equity Partners, C3 AI, Bain & Company, and GE.

LinkedIn →
Roy Liu
Capital StrategyRoy Liu

Co-founder and Managing Director of Hercules Capital, with more than 30 years in venture debt and structured growth financing across technology and infrastructure. Previously CFO and VP of Finance at technology companies.

LinkedIn →
Shawn Kerns
Energy DevelopmentShawn Kerns

More than 30 years in energy, including as Chief Operating Officer of California Resources Corp., California’s largest oil producer, where he ran $2B capital budgets and 800 staff.

LinkedIn →
Mira Pogaci
EU Corporate CounselMira Pogaci

Corporate counsel for Dardania AI in Europe. Previously served on the National Economic Council of Albania and in legal roles at KEK, Kosovo’s state energy corporation, and led the Albanian Commercial Union.

LinkedIn →
Davis George
Strategy & Corporate DevelopmentDavis George

Served in senior finance, operations, and M&A roles at technology companies. Completed multiple $100M+ M&A transactions. Previously William Blair, Sumeru Equity Partners and 3Gtms, through its sale to Descartes.

LinkedIn →
Contact

Talk to Us About Capacity.

Phase 1 delivers 300 MW with first energization in 2027. Turnkey, GPU-native, direct-contracted power.

Platform OperationsFaton Gjuka